The order: to transport an intake manifold for a full-service supplier of small hydroelectric power plants from Prjedor (Bosnia) to St Pölten (Lower Austria). The challenge when transporting this component was securing the cargo during loading. As this exceptional load was elbow-shaped, we held it tight with chains in order to ensure that the manifold arrived at its destination smoothly and safely.