1250 meters of anchor chains as well as a 33 m long and 81 tons heavy mooring pile – equipment for a floating offshore oil rig – had to be transported from Bilbao (Spain) to Rotterdam (The Netherlands) urgently. With a specially chartered vessel m/v TOVE, the goods could be collected from two different terminals in Bilbao and then shipped out together.